EV

Kansas will install six state-funded fast EV chargers

Published

on

Kansas governor Laura Kelly announced on Wednesday a state funding of $4.6 million to install six fast electric vehicle (EV) chargers.

These chargers will open to the first six locations selected for the state’s National Electric Vehicle Infrastructure (NEVI) Formula program.

Advertisement

NEVI Forumula funds require EV charging stations to be located along with Alternative Fuel Corridors (AFC). These chargers will be installed every 50 miles and within 1 travel mile of the AFC.

The six new direct current fast direct current (DC) charging stations will be installed in the following locations in Kansas:

Advertisement
  • Emporia, Flying J, 4215 W Hwy 50 (I-35)
  • Garden City, Love’s, 3285 E U.S. 50 (U.S. 400)
  • Cherokee, Pete’s, 20 U.S. 400
  • Fredonia, Pete’s, 2400 E Washington St. (U.S. 400)
  • Belleville, Love’s, 1356 US Highway 81 (U.S. 81)
  • Pratt, Casey’s, 1900 E 1st St (U.S. 400)

These NEVI chargers should be capable of providing a minimum of 600kW power output and charge four vehicles simultaneously.

With these chargers, the Kansas state government is looking to fill gaps in EV charging stations among major highways and interstate systems.

Furthermore, these charging stations must be opened and accessible to all of the public and tagged with other amenities including restrooms, food and beverage, and shelter from inclement weather.

Advertisement

With this infrastructure completed, the Kansas Department of Transportation (KDOT) may use the funds for EV charging infrastructure on any public road or other publicly accessible locations.

“As more electric cars and trucks make their way onto Kansas roadways, they will need access to adequate charging facilities,” Governor Laura Kelly said. “With these awards, we’ll ensure electric vehicle charging stations are accessible to all Kansans for local and long-distance trips.”

Advertisement

(source)

Advertisement
Exit mobile version